Evaluation of vertical wall-to-guardrail transition

dc.authorscopusid6602829968
dc.authorscopusid12785606300
dc.authorscopusid7005395233
dc.contributor.authorAtahan, Ali O.
dc.contributor.authorBonin, Guido
dc.contributor.authorEl-Gindy, Moustafa
dc.date.accessioned2024-09-19T15:41:18Z
dc.date.available2024-09-19T15:41:18Z
dc.date.issued2008
dc.departmentHatay Mustafa Kemal Üniversitesien_US
dc.descriptionDesign Engineering Division and Computers in Engineering Divisionen_US
dc.descriptionASME 2008 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, IDETC/CIE2008 -- 3 August 2008 through 6 August 2008 -- Brooklyn, NY -- 87307en_US
dc.description.abstractTransition barriers are used to connect longitudinal barriers that have different stiffnesses. They are designed to provide a gradual increase in stiffness towards the stiffer barrier section. In this study, a W-beam rail and a W-beam rubrail transition connecting a rigid bridge rail to a semi-rigid guardrail was evaluated using numerical and experimental methods. First, a finite element model of the transition design was constructed and validated using a 2000 kg pickup truck impact. Then, a series of vehicle models, i.e., 900 kg compact automobile, 8000 kg single unit truck and finally 30,000 kg heavy truck was used to evaluate the impact performance of the same transition design numerically. Simulation results predict that the double W-beam transition barrier performs acceptably in containing and redirecting all vehicles except 30,000 kg heavy truck. Occupant injury criteria were also found to be acceptable for all the cases, except 30,000 kg truck impact. Performing further simulations with vehicle sizes heavier than 8,000 kg that exist in crash testing guidelines is recommended to evaluate the acceptability limit of existing W-beam rail and a W-beam rubrail transition. Copyright © 2008 by ASME.en_US
dc.identifier.doi10.1115/DETC2008-49088
dc.identifier.endpage598en_US
dc.identifier.isbn978-079184329-1
dc.identifier.scopus2-s2.0-81155154288en_US
dc.identifier.scopusqualityN/Aen_US
dc.identifier.startpage591en_US
dc.identifier.urihttps://doi.org/10.1115/DETC2008-49088
dc.identifier.urihttps://hdl.handle.net/20.500.12483/14166
dc.identifier.volume5en_US
dc.indekslendigikaynakScopusen_US
dc.language.isoenen_US
dc.relation.ispartofProceedings of the ASME Design Engineering Technical Conferenceen_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectComputer simulationen_US
dc.subjectCrash testen_US
dc.subjectLSDYNAen_US
dc.subjectRailen_US
dc.subjectRoadside safetyen_US
dc.subjectRubrailen_US
dc.subjectTransitionen_US
dc.subjectVehicleen_US
dc.subjectW-beamen_US
dc.titleEvaluation of vertical wall-to-guardrail transitionen_US
dc.typeConference Objecten_US

Dosyalar